"I think we can probably start integrating systems before F/A-XX delivers," William Toti told the Senate Armed Services Committee, laying out a near-term path for naval aviation that prioritizes collaborative combat aircraft (CCA) deployments ahead of the Navy’s next-generation fighter.
Timing and trade-offs: CCAs now, F/A-XX later
Toti, the White House nominee to serve as Navy undersecretary who has been performing the duties of that office since May, told senators the Navy should not wait for the F/A-XX to field robotics-enabled “robot wingmen.” He argued the service can begin integrating CCA systems with existing platforms—specifically the F-35—before F/A-XX arrives. At the same time, he called F/A-XX “a critical capability,” noting the long service life of aircraft carriers and rejecting the idea that the F-35 will be the last carrier-launched fighter.
F/A-XX program milestones and fiscal posture
The Navy selected Boeing to build the F/A-XX in September, and the service expects the aircraft to fly in the 2030s. Toti also told the committee that the Trump administration’s 2027 budget request provided only the “barest support” for the program, signalling constrained near-term funding even as the Navy frames F/A-XX as a long-term carrier asset.

Audit-ready is a season. It shouldn't be.
Evidence in spreadsheets, controls drifting between audits, frameworks multiplying on flat headcount. Nubivance runs continuous compliance on Rapid7 Cyber GRC - SOC 2, HIPAA, ISO 27001, PCI, CMMC.
End the scrambleNavy steps on CCAs: a prototype RFI and carrier integration
In September the Navy issued a prototype-focused request for information on CCAs that detailed desired attributes, including integration with aircraft carriers. That RFI reflects a practical approach: buy or build low-cost, attritable unmanned aircraft that can operate as part of a carrier air wing rather than waiting for a clean-sheet manned fighter to incorporate unmanned teaming by design.
Air Force testing and service relationship
A month after the Navy’s RFI, the Air Force tested two CCA platforms in air combat maneuvers—demonstrations that Toti cited when describing the Air Force as having “been leading this issue.” He said the Navy is “following closely behind,” but emphasized that carrier integration is “critically important” as the Navy develops its own approach to CCAs.
What this means for aircraft carriers, Navy procurement leaders, and the Air Force
- Aircraft carriers: Carriers are framed as enduring platforms. Toti stressed the Navy will operate carriers “around for the next 50 years,” creating a long-term requirement for manned–unmanned teaming that works from carrier decks.
- Navy procurement leaders: With prototype RFIs and an intent to leverage existing aircraft like the F-35 for early CCA integration, procurement managers will need to balance investments in attritable unmanned assets now against continued funding for F/A-XX development into the 2030s.
- The Air Force: Having tested CCAs in air combat maneuvers, the Air Force serves as an operational and developmental reference point; the Navy’s pacing decision is to follow and adapt those lessons for the unique constraints of carrier operations.
Toti’s testimony combined near-term pragmatism with strategic continuity: press forward with CCAs using current airframes for earlier fielding, while preserving the F/A-XX as the next-generation manned fighter designed “from ground up” to control collaborative unmanned aircraft. Toti—whose résumé includes service as a Navy captain, a stint as CEO of Sparton Corporation, and a Pentagon senior advisor role beginning in 2024—is asking the Senate to confirm him to the permanent undersecretary role as the Navy threads that needle.
The immediate questions remaining are operational and budgetary: how quickly can the Navy integrate CCAs with the F-35 and carrier air wings, and how will constrained early funding for F/A-XX shape the long campaign to deliver a carrier-capable next-generation fighter in the 2030s? The answers will emerge through procurement choices, testing rhythms, and the confirmation process underway this fall.
Source: Defense One, "Navy will likely fly CCAs sooner than F/A-XX, White House nom says"




